Recent Activity Highlights

Retrieved Cut Coil and Returned Well to Production
An operator in the Powder River Basin (WY) needed to remove 1,800' of stuck fish to restore production. Despite multiple horizontal cuts at over 12,400' in horizontal section, traditional methods had failed to retrieve any of the coil.
  • VT rigged up and had pipe moving within 2 hours.
  • Successfully shifted the entire fish 360' uphole before the deepest cut parted and the rest of the coil was retrieved.
  • Operator then latched onto the remaining coil and bit, pushing it past the perfs to restore production.

VT Has Proven Results—Don't Let Stuck Pipe Slow You Down
Many companies face these challenges, but with VT, you have a reliable solution ready to mobilize immediately.
Contact Us

Recent Activity Highlights

Rapid Solutions for Stuck Wellheads and Tubulars
When pipe is being worked and the wellhead is stuck, don't take unnecessary risks—mobilize Vibration Technology in minutes to resolve your stuck situation efficiently.
Proven Success in Real-World Operations
Wellhead Released in Under a Minute
An operator in Oklahoma faced a stuck wellhead. Having previously achieved success with VT on a similar well, they opted for this rapid solution.
  • 8:00 AM – Arrived on location and rigged up.
  • 8:05 AM – Started vibration.
  • 8:06 AM – Wellhead freed.
  • Over 95% success rate in these types of operations.

VT Has Proven Results—Don't Let Stuck Pipe Slow You Down
Many companies face these challenges, but with VT, you have a reliable solution ready to mobilize immediately.
Contact Us